Kitchen progress

Posted 3 years, 6 months ago by Alderete

Here’s the before photo (which is after we removed a bunch of stuff from that side of the room):

Since that point, we’ve ripped out drywall, moved some pipes, and — most importantly — put our new (old/used) stove in place:

But, the real work starts on Monday. This weekend (indeed, tonight) we’re moving all of our stuff out of the kitchen. On Monday, the demolition crew will take everything out, except for some wonderful, 100 year-old wainscot (you can see it in the 2nd photo, covered in horrible paint and glue; it’s the lower part of the walls). We’ll be basically down to the studs.

On Wednesday, the electrician shows up, roughs in, and leaves. Then new plumbing, drywall, and we’ll have 80% of the project done.

With 80% left to do.

Possibly Related

The following postings on this weblog may be related to the post you’re viewing:

2 Responses to “Kitchen progress”

  1. mom Says:

    Oh my! What a project! Oh my! What a mess it’s gonna be for a while! On my! So much work! Oh my!

  2. Brian Mikol Says:

    Wow – a lot of work, but it’s already very clear that your kitchen is going to be awesome when it’s done! Love the new (old/used) stove!

Leave a Reply

Don't use this form to comment, it doesn't work, and shouldn't be displayed. Use the next one instead...



Comments accept Textile & Basic XHTML

Note: All comments are subject to moderation and delayed publication.


surrounding